Built for Your Trade

Concrete & Foundation Leads from New Building Permits

Foundation work is permitted work. Footings, slabs, retaining walls, underpinning, and seismic retrofits all pass through a building department before a single yard is poured — which means every one of them is public record days or weeks before the concrete is ordered. PingPermit surfaces those filings daily with the address, the scope, and what the owner told the city it would cost.

$20/month. Continue to secure checkout to unlock the full feed. Cancel anytime.

The Signals That Matter

Not every permit is a goldmine. We extract the critical descriptions and project valuations that indicate real money is being spent on your trade.

Foundations, Footings & Slabs

Permits naming concrete, foundation, slab, or footing work — scored as heavy-material jobs.

Retaining Walls & Underpinning

Structural filings that need forms, rebar, and a pump on site.

New Construction

Every ground-up build starts with a foundation pour, and the permit lands before the hole is dug.

The Pour Is Scheduled Once

Concrete is awarded early and awarded once. Miss the window between the permit and the schedule and the job is gone for the life of the project. Reaching an owner or a GC the week their foundation permit posts puts you in the conversation before the pour date is locked.

How We Detect Them

The scoring engine reads each permit description and weights concrete, foundation, slab, retaining-wall, and underpinning language as heavy-material work, then layers on the declared valuation so the large pours rise to the top of the feed.

Frequently Asked Questions

Q. Are these residential or commercial?

Both. The feed shows the work description and the declared valuation, so you can filter down to the scale of job your crew actually wants.

Q. Does this include seismic and structural retrofits?

Yes. Retrofit, underpinning, and structural repair filings are surfaced alongside new foundations — they are some of the highest-value concrete work in older housing stock.

Q. How fresh are the filings?

Permits reach the feed roughly 24 to 48 hours after they are filed, and the feed is rebuilt daily from each jurisdiction's public records.

Stop buying shared leads.

See exact addresses and scopes of work with a monthly subscription. Cancel anytime.

$20/month. Continue to secure checkout to unlock the full feed. Cancel anytime.